Home > Projects

Holberg D.N.D. Road Hydrotechnical upgrades

slide area ditch

North Island Rockpro completed Hydro-technical upgrades to the Department of National Defense Holberg radar base access road.

This work included the manufacture of specified crush to place on the road surface and specified drain cobble to armor ditches along with culvert replacements and armoring, slide debris cleanup and new signage. Our Extec E-7 mobile screen plant was operated onsite and was instrumental in providing the materials efficiently and inexpensively.

We met or exceeded all project requirements while maintaining a strong and efficient relationship with the Department of National Defense. Our extensive experience operating in the Holberg area was indispensable in getting the work done quickly.


Location:
North Vancouver Island
Client:
Department of National Defense
Year of Completion: 
June 2016
Responsibility:
General Contractor (excavation, blasting and drilling, aggregate, compacting and grading, ditches and culverts, pit development, material screening, trucking material and equipment to and from the site.)

img_0160

img_0108 img_0053 img_0049 slide area ditch img_0009