Holberg D.N.D. Road Hydrotechnical upgrades

North Island Rockpro completed Hydro-technical upgrades to the Department of National Defense Holberg radar base access road.

This work included the manufacture of specified crush to place on the road surface and specified drain cobble to armor ditches along with culvert replacements and armoring, slide debris cleanup and new signage. Our Extec E-7 mobile screen plant was operated onsite and was instrumental in providing the materials efficiently and inexpensively.

We met or exceeded all project requirements while maintaining a strong and efficient relationship with the Department of National Defense. Our extensive experience operating in the Holberg area was indispensable in getting the work done quickly.


Location:
North Vancouver Island
Client:
Department of National Defense
Year of Completion: 
June 2016
Responsibility:
General Contractor (excavation, blasting and drilling, aggregate, compacting and grading, ditches and culverts, pit development, material screening, trucking material and equipment to and from the site.)

img_0160

img_0108 img_0053 img_0049 slide area ditch img_0009

Logging Road Construction for BC Timber Sales

We are responsible for the maintenance and repair of logging roads for BC Timber Sales on northern Vancouver Island.

This ongoing work includes deactivation and reactivation of roads and access points, bridge installation and repair as well as culvert replacements. Our high quality roads help ensure the safety of people and workers travelling in the area.

The huge fleet of heavy duty equipment we have available keeps our projects on schedule and on budget. Easy access to aggregate from our quarry eliminates delays and ensures top quality products are used.


Location:
North Vancouver Island
Client:
BC Timber Sales
Year of Completion:
Ongoing contract
Responsibility:
General Contractor (excavation, blasting and drilling, aggregate, compacting and grading, ditches and culverts, bridge repair and replacement, trucking material and equipment to and from the site.)

bridge installation

bridge build

Laydown Yards for Vestas

Built as transfer stations for transporting massive wind turbines on route to the Cape Scott Wind Farm.

Two laydown yards were needed to manage and organize the fragile freight being delivered to the wind farm site for final installation. We cleared the land and prepared the two sites to the precise grade and specifications necessary for laying down the over dimensional loads safely. A perfectly level site with effective drainage was necessary to maintain the grade while loading, unloading and storing the windmill components.

The East Laydown Yard is two acres and the West site is five areas. Multiple access points and security fencing finished the projects. The Cape Scott Wind Farm is soon to be operational and North Island Rockpro is proud to be part of this enormous project.

Location: Port Hardy
Client:
Vestas
Year of Completion:
2013
Responsibility:
General Contractor (Surveys, logging, excavation, debris removal, aggregate supply, compacting and grading, trucking material and equipment on and off the site, security fencing.)

 

lay down yardlay down yard lay down yard Lay down yardLay down yardLay down yardLay down yardLay down yardlaydown-yard9laydown yard sign

Seine Floats

North Island Rockpro was the General Contractor in charge of rebuilding the Seine Floats in Port Hardy, British Columbia.

This million and a half dollar project was funded by the District of Port Hardy and needed to address a wide range of local uses. The entire shoreline was reconstructed to properly support the surrounding area. A scenic day use park and pathway was incorporated as well as washroom facilities.

The area also serves as short and long term parking for fishermen and boaters. A substantial amount of drilling and blasting were required to provide better access to the facility. North Island Rockpro as General Contractor for the site organized the completion of all aspects including landscaping and paving. All the infrastructure was upgraded during this process to better supply the facilities with water and other utilities such as sewer.

Location:
Port Hardy, British Columbia
Client:
District of Port Hardy
Year of Completion:
2013
Responsibility:
General Contractor (Surveys, excavation, blasting and drilling, aggregate, compacting and grading, culverts, drainage, sewer, water, paving, landscaping, building construction, trucking material and equipment to and from the site.)

seine floats pathseine floats

seine floatsseine floatslong term parking

Road Construction for Probyn Log Ltd

Logging road construction for Probyn Log Ltd completed by North Island Rockpro.

Construction, maintenance and repair for numerous logging roads on northern Vancouver Island. This ongoing work includes bridge building and repair and culvert installation and replacement. Rockpro is also responsible for deactivating and reactivating logging roads.

We build and maintain roads at Georgie Lake, Ronning Main, SanJo Main, Raft Main and MackJack Main, located north west of Port Hardy. Rockpro ensures that each road is built with our high standards and has the solid surface necessary for the heavy logging trucks that drive these roads daily.


Location:
North west of Port Hardy, British Columbia
Client:
Probyn Log Ltd
Year of Completion:
Ongoing Contract
Responsibility:
General Contractor (excavation, blasting and drilling, aggregate, compacting and grading, ditches and culverts, bridge repair and replacement, trucking material and equipment to and from the site.)

temp phototemp photo
atluck lake roadatluck lake road

Holberg Road Upgrade

North Island Rockpro completed the upgrade of Holberg Road to ensure safe passage for all windmill components headed for the Cape Scott Wind Farm.

In order to accommodate the large and heavy loads, corners were widened and vertical curves were reduced. Trees were removed as necessary as well as brush out areas to allow clearance for the fragile freight.

As the General Contractor for the project, all aspects of construction were completed. North Island Rockpro was also responsible for constructing two Lay Down Yards for organizing the transportation of the components for the final leg of the journey to the Wind Farm.

Location:
Between Port Hardy and the Cape Scott Wind Farm
Client:
Vestas
Year of Completion:
2013
Responsibility:
General Contractor (excavation, blasting and drilling, aggregate, compacting and grading, ditches and culverts, trucking material and equipment to and from the site.)